Skip to content
Make observations useful

Fume hood inspection checklist for facilities teams

A useful fume hood inspection checklist records the equipment, what was observed and who will follow up. Use this facilities checklist to organise a visual condition review and records check alongside your site procedure.

External PVC extraction fan and connected ductwork
External PVC extraction fan and connected ductwork.

Define the review and its limits

Agree who is carrying out the review, which equipment is included and what can be observed safely. Use the cupboard instructions and your laboratory procedures to set the scope and timing. Technical measurements and intrusive checks belong with the people authorised to perform them. Familiarity with the fume hood air path helps identify which visible components to record.

Our fume hood maintenance guide connects this record with routine care, service attendance and testing. Keep the checklist with the asset history so the next person can see what changed.

Begin with the building, room, asset number, cupboard model, date and reviewer. Add the associated fan identifier from existing records if it is available; the review does not require access to a roof or plant area.

Use a repeatable condition record

Record a clear observation for each applicable item. Mark an item as not checked when it falls outside the agreed scope, and give any follow-up action to a named person.

Visual review and records checklist
AreaRecord from a safe positionFollow-up information
IdentificationAsset label, model and room match the register.Missing or conflicting identifiers.
Visible conditionDamage, corrosion, cracked glazing or damaged seals that are visible.Location and a safe-to-take photograph.
Working spaceClutter, stored materials or apparatus affecting the intended air paths.Responsible laboratory contact and task involved.
Operator informationVisible instructions, sash labels and displayed status.Exact wording of any abnormal indication.
DocumentsLatest service and test records, due tasks and outstanding actions.Record owner, missing document and next action.

This record captures condition and administration. Performance testing establishes information that a visual review cannot provide; use our fume cupboard testing page for that separate enquiry.

Write findings that someone can act on

Describe what you see without assigning an unconfirmed cause. “Lower-left sash seal visibly damaged” gives a technician a clearer starting point than “poor extraction”. Where a displayed indication is involved, copy its wording and record when it was observed.

Use one row per finding: observation, equipment ID, person notified, action owner and status. Keep the original observation when an action is updated, rather than overwriting the history.

If the cupboard alarms or its safe operation is in doubt, follow the local stop-work and reporting procedure. Arrange review by the responsible person before affected work continues. The fault-reporting guide helps organise the information for service support.

Close the record after follow-up

Attach the service findings or test report to the same asset record. Record what was completed, any remaining restrictions and who confirmed the next step under your site arrangements.

A checklist works best when outstanding actions are visible to both laboratory and facilities teams. Review open items when scheduling the next attendance, and retain the documents after the work is closed.

When booking fume cupboard servicing, share this record and explain any contamination or access arrangements. That gives us a useful starting point for discussing the visit.

Turn the inspection record into the next action

Send the asset details, observed condition and outstanding actions. We can discuss servicing or separate testing requirements with the person responsible for your cupboard.