Ducting for your fume extraction system

Need new ducting, a repair or a change to an existing system? Tell us about the room and the work it supports. We can help define what is needed.

Chemical-resistant extraction duct fabrication
Chemical-resistant extraction duct fabrication.
Good to know

You can start with a simple enquiry. The technical details below are there for your property or design team.

Let’s start with what you know

These details are helpful if you have them:

  • Your location and what you want to change
  • What the extraction system is used for
  • Photos or existing plans, if available

Missing something? That’s fine. Call 0800 023 778 or email us and we’ll take it from there.

Technical and project detailsFor property teams, quantity surveyors and architects
01 / Duct fabrication

Describe the chemical duty clearly

We fabricate and install PVC ducting for corrosion-resistant applications, with standard diameters from 150 mm to 400 mm. We’ll confirm the material, airflow requirements and configuration for your project.

Provide the substances involved and available safety data sheets, together with the process conditions the designer needs to assess. Explain any expected changes in use. Ask FumeCare to confirm the proposed material and fabrication scope for those conditions instead of assuming that every PVC component suits every chemical application.

02 / Duct fabrication

Prepare a fabrication brief

InformationInclude where available
ApplicationProcess description, substances and operating conditions.
RouteDimensioned sketch, ceiling/roof route and connection points.
System designRequired airflow and design information from the responsible designer.
ComponentsBends, transitions, joints, supports and access needs.
Scope boundaryFabrication only, supply, installation or part of a full extraction system.
03 / Duct fabrication

Plan the connections and access

Identify the cupboard outlet, fan connection and discharge arrangement on the drawing. Mark building penetrations and areas requiring coordination with other trades or the building owner. If drawings are preliminary, label them as such and identify which dimensions still require a site check.

Ask how the proposed arrangement allows inspection and maintenance. Consider how fabricated sections will reach the installation area and whether the work affects occupied rooms. Resolve the route and trade coordination before components arrive.

04 / Duct fabrication

Compare like-for-like quotations

  • Use the same route drawing and chemical/process brief for each quotation.
  • Ask suppliers to identify material assumptions and unconfirmed dimensions.
  • List included fittings, supports, site joints and installation work.
  • Clarify who checks system performance and supplies the handover records.

Flexible ventilation hose and fabricated chemical extraction ducting have different specifications. For a laboratory project, have the material, construction and performance requirements reviewed as one system.

A useful first request is: “We need fabricated ducting between this cupboard and the proposed fan; the attached sketch shows the route and constraints.” Add chemical and design information, then ask which details must be resolved before a firm fabrication quotation. The result should be a defined scope, not simply a length of pipe.

The next step

Start your ducting enquiry

Send your route sketch, application and available chemical information. We’ll help define the fabrication and installation scope.