Skip to content
Replacement air

Planning replacement air for a fume hood

Air extracted by a fume hood has to be replaced. Plan that replacement air with the building ventilation team so the room supports the cupboard through its intended operating conditions.

Rooftop ductwork forming part of a laboratory extraction system
Rooftop ductwork forming part of a laboratory extraction system.

Start with the whole room

Make-up air is the replacement air needed as an extraction system removes air from a space. In a laboratory, the fume cupboard is one part of the room’s overall supply and extraction arrangement.

Record the other cupboards and extraction equipment in the room, as well as the building’s supply-air system. The ventilation designer needs to consider how those systems operate together and how the room is used.

Opening a door is not a design for replacement air. Door movement can also disturb conditions around the cupboard opening, so planned supply and ordinary room access need to work together.

For the equipment sequence, see how a ducted fume hood works. The cabinet-ventilation brief covers a different extraction application that may also need coordination.

Describe the operating scenarios

ScenarioInformation for the project team
Normal workWhich cupboards and other extracts run at the same time?
Changing demandWhich systems vary their extraction or operating state?
After hoursWhat extraction must remain operating for the approved use?
Building changesHas supply air, room layout or equipment changed?
Fault responseHow are ventilation faults identified and handled?

Use the laboratory’s actual procedures when preparing these scenarios. They provide a clearer brief than a single assumed operating condition.

Coordinate variable extraction

Our SashDrive design regulates exhaust fan speed using sash position. The building team needs the proposed operating and control information when assessing the room’s replacement air.

Share the cupboard selection, intended use and any existing ventilation drawings early. Our SashDrive planning guide covers the equipment information needed for that discussion. Any energy assessment should use the actual system and operating pattern.

Collect a useful project record

  • Room plan, intended use and typical occupancy.
  • Existing supply and extract drawings, where available.
  • Cupboard and fan identification for each connected system.
  • Normal and after-hours operating procedures.
  • Recent ventilation changes, faults and test records.

We can discuss the cupboard, fan and extraction equipment with your project team. The building ventilation design and completed system assessment should address the room and equipment together. Use our installation planning checklist to record who is responsible for each part.

Bring the room ventilation into the discussion

Send the cupboard proposal and available building ventilation information. We’ll help coordinate the equipment details with your project team.